Project

Our Projects Moudir Building, 2013-2014

Client: Zardman

Task: Complete design, supply & installation for the Fire Alarm System.

Details: Building consists of 2 basement of 1250m2 each, a ground floor and 7 floors each (900m2) for a total built up area of 10,000 m2,

Each floor has either one, two or three tenants, each with their own design and interior sections.
The FAS is an analog addressable system currently installed in the basement, technical areas and occupied floors and consisting of a large number of smoke detectors, heat detectors, break glass and sirens for adequate detection and alarming.

The system is installed in such a way, future expansion for prospective tenant would seamlessly connect to the existing system.